W. CENTRAL BLVD. ROADWAY RECONSTRUCTION, STREETSCAPE, AND SANITARY SEWER REPLACEMENT DESIGN/BUILD

 

Project Detail

Size/Type:

.55 Miles / Roadway

 

Services:

TRANSPORTATION

ENGINEERING

PERMITTING

SURVEY

ENVIRONMENTAL

LANDSCAPE

M/E/P

Contact Info

500 West Fulton Street

Sanford, FL 32771

(866) 609-0688

info@cphcorp.com

Mon - Fri 8:00 - 5:00

W. Central Blvd. Roadway Reconstruction, Streetscape, and Sanitary Sewer Replacement Design/Build

  • $6.5 Million Dollar Design/Build Project
  • 0.55 Mile Infrastructure Project
  • Main Gateway/Entry Roadway to City of Orlando’s Major League Soccer Stadium
  • Complete Street and “Walkability” Upgrades
  • Upsizing the Existing Gravity Sewer Line from an 8” Sanitary Sewer to a 18” & 21” Sewer System.
  • Addition of Left Turn Lanes at the Existing Intersections
  • New Traffic Signal with a BRT (Bus Rapid Transit) Phase
  • Additional Right-of-Way and Easement Coordination
  • Placing All Overhead Utility Lines Underground (Including the Duct Bank Design
  • Maintenance of Traffic Plans
  • Landscape/Hardscape Features Including Street Lighting, Trees, Decorative Crosswalks, and Street Furniture

Back to Projects

CPH is recognized as one of the nation's top 500 engineering firms (as ranked by ENR Magazine) a direct result of the efforts of our staff and our successful relationship with our clients. Our ability to incorporate learned experiences and procedures into our operations helps our clients get the best product for their needs.

 

 

CALL US NOW

 

Toll Free: 866.609.0688

 

SEND US A MESSAGE

 

General: info@cphcorp.com