PALM COAST WTP NO. 3

 

Project Detail

Size/Type:

3.0 MGD /  Water Treatment Pant

4,500 SF / Chemical Storage Building

6,500 SF / Operation Building

 

Services:

ARCHITECTURE

CEI

STRUCTURAL

PLANNING

PERMITTING

SURVEY

M/E/P

CIVIL SITE DESIGN

Contact Info

500 West Fulton Street

Sanford, FL 32771

(866) 609-0688

info@cphcorp.com

Mon - Fri 8:00 - 5:00

Palm Coast Water Treatment Plant No. 3

  • New 3.0 MGD exandable to 9.0 MGD water treatment facility and administration offices
  • Twenty-four acre campus
  • 3.0 MGD Low Pressure Reverse Osmosis skids (RO 1.5 MGD)
  • Well field system
  • Concentrate treatment & disposal system
  • Finished water distribution system
  • Emergency generator building with sound attenuation features
  • 2 million gallon water storage tank
  • Chemical storage building (4,500 sq. ft.)
  • Operation building containing laboratory, training rooms, administration offices & locker rooms (6,500 square feet)
  • Clear well with odor control system and transfer pumping station
  • High service pump station

 

 

Back to Projects

CPH is recognized as one of the nation's top 500 engineering firms (as ranked by ENR Magazine) a direct result of the efforts of our staff and our successful relationship with our clients. Our ability to incorporate learned experiences and procedures into our operations helps our clients get the best product for their needs.

 

 

CALL US NOW

 

Toll Free: 866.609.0688

 

SEND US A MESSAGE

 

General: info@cphcorp.com